Nigeria LNG Train 7 project is an ongoing expansion of the Nigeria LNG Terminal at Bonny Island, Nigeria. The project, the cost is approximately US$ 6.5bn, will primarily add a seventh LNG processing unit to the Nigeria LNG Terminal at Bonny Island, with a production capacity of 4.2Mtpa and supporting infrastructure including an 84,200m³ storage tank, a 36,000m³ condensate tank, and three gas turbine generators at the terminal.
It will also include debottlenecking of the existing six trains that will increase the processing capacity by 3.4Mtpa, and the construction of wells and pipelines to supply additional feed gas to the LNG facility. Upon completion, the Nigeria LNG Train 7 project will increase the Nigeria LNG Terminal production capacity by 35% from the current 22mtpa to 30mtpa.
Nigeria LNG Train 7 project is an ongoing expansion of the Nigeria LNG Terminal at Bonny Island, Nigeria. The project, the cost is approximately US$ 6.5bn, will primarily add a seventh LNG processing unit to the Nigeria LNG Terminal at Bonny Island, with a production capacity of 4.2Mtpa and supporting infrastructure including an 84,200m³ storage tank, a 36,000m³ condensate tank, and three gas turbine generators at the terminal.
It will also include debottlenecking of the existing six trains that will increase the processing capacity by 3.4Mtpa, and the construction of wells and pipelines to supply additional feed gas to the LNG facility. Upon completion, the Nigeria LNG Train 7 project will increase the Nigeria LNG Terminal production capacity by 35% from the current 22mtpa to 30mtpa.